Geyontech Customer Case Study — High-Precision Helical Gears Powering Collaborative Robot Joint Upgrades
Date: 2026-07-07 | Industry: Smart Robotics
1. Client Background
Company A, a Shenzhen-based collaborative robot manufacturer producing approximately 3,000 collaborative robots annually for 3C electronics assembly and light material handling applications. Their 6th-generation joint module required higher transmission accuracy and backlash control, which their existing supplier could not consistently meet — specifically backlash ≤6 arcmin in mass production.
2. Challenges
| Parameter | Requirement | Previous Supplier Performance |
|---|---|---|
| Transmission Backlash | ≤6 arcmin | 5–12 arcmin, high variation |
| Tooth Surface Hardness | HRC 58–62 | HRC 52–56 |
| Batch Delivery Lead Time | 20 days/batch | 28–35 days |
| Noise (1m distance) | ≤58 dB(A) | 62–65 dB(A) |
3. Geyontech Solution
Geyontech developed a custom high-precision helical gear pair (Module 1.25, gear ratio 3:1, helix angle 15°):
- Material Process: 20CrMnTi carburized and quenched, tooth hardness stable at HRC 59–61
- Accuracy Grade: Ground to DIN 6, cumulative pitch error ≤0.012 mm
- Surface Treatment: Superfinishing + smoothing, surface roughness Ra ≤0.3 μm
- Full Inspection: 100% gear measurement center inspection + matched marking, each pair with inspection report
4. Results
After 3 rounds of pilot production (100 pairs each), mass production began in Q1 2026:
| Metric | Before | After | Improvement |
|---|---|---|---|
| Backlash | 5–12 arcmin | 4–5.5 arcmin | 60% better consistency |
| Noise Level | 62–65 dB(A) | 54–57 dB(A) | ~8 dB reduction |
| Delivery Time | 28–35 days | 18–22 days | 35% shorter |
| Batch Pass Rate | 85% | 98.6% | +13.6% |
Customer feedback: “Geyontech significantly outperformed our previous supplier in precision consistency and delivery reliability, enabling smooth mass production of our 6th-generation joint module.”
5. Customer Testimonial
“From prototype to mass production in under 3 months — Geyontech’s technical responsiveness and process control left a deep impression on us.” — Procurement Director, Company A